Building & Trade Permits

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

We have modernized our permitting and licensing process with OpenGov, a secure, easy-to-use online portal that puts everything in one place.

Apply online, pay online, request inspections, and track your application every step of the way. OpenGov brings greater transparency, convenience, and efficiency to how we serve our community.

Click here to access our online permitting portal.

Upper Dublin Township has fully transitioned to online permitting through OpenGov. Paper copies of building and other permit applications are no longer available. All applications must be submitted online at: upperdublin.net/permits.


General Information

Building plans and permit applications are required to be submitted and permits must be issued by Upper Dublin Township prior to commencement of any work. 

Permit Submission Guides are available for download at the bottom of this page.

Apply for your permits online at: upperdublin.net/permits

Important Update: Electrical Plan Review Process

Effective August 15, 2026: Upper Dublin Township will no longer accept electrical plans that have been reviewed and/or stamped by a third party. All electrical plans must be submitted to the Township for in-house review.

The final day to submit third-party-reviewed and/or stamped electrical plans is Friday, August 14, 2026.


The following applications are available on OpenGov:

  • Contractor Registration: Must be completed by all contractors prior to submitting any permit applications. Projects being completed by a contractor cannot apply for a permit without the completion of this registration.
  • Building Permits
  • Zoning Review Pre-Permit Submittal Form: Required any time you are adding a structure onto the property which includes but is not limited to:
    • New Construction
    • Additions
    • Sheds
    • Detached garages
    • Decks
    • Signage
    • Porticos/covered porches
    • Covered and/or enclosed decks
    • Pools, hot tubs, etc.
    • Exterior stairs
    • Retaining walls
    • Chicken coops
    • New cell towers or antennas
  • Demolition Permit
  • Electrical Permit
    • Note: Beginning August 15, 2026, all electrical plans will be reviewed in-house. Third-party-reviewed and/or stamped plans will not be accepted after August 14, 2026.
  • Fence Permit
  • Grading Permit
  • Mechanical & Fuel Gas Permit
  • Plumbing & Sewer Permit
  • Pool & Water Feature Permit
  • Roofing Permit
  • Shed Permit:  Used for residential sheds, gazebos, pergolas, chicken coops, or other accessory structures.
  • Sign Permit (Temporary & Fixed)
Fees & Late Fees
Turnaround Time
Contractors
Demolition

Permit Guides, Applications, & Forms

Please note that the page will refresh each time a document folder is opened or closed and you must scroll back down to view the files in that folder.

Building & Trade Permit Documents